• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Ignition Modulator Adjustment.
FUEL INJECTOR ASSEMBLY REMOVAL, CLEANING, INSPECTION AND INSTALLATION

TECHNICAL MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR ENGINE 8V92TA
Page Navigation
  467    468    469    470    471  472  473    474    475    476    477  
img
. . . . . .
TM 55-2815-574-24
0090
FOLLOW-ON MAINTENANCE
1.
Install cylinder head poppet valve rocker arm cover (WP 0044).
2.
Install electronic governor actuator (WP 0098).
3.
Install electronic governor rod (WP 0097).
4.
Install air inlet collector assembly (WP 0104).
5.
Install crankcase breather limiter assembly (WP 0106).
6.
Install air intake housing (WP 0103).
7.
Install powered section engine hatch (TM 55-1925-205-23).
8.
Install operator's cab (TM 55-1925-205-23).
9.
Install intake plenum assembly (TM 55-1925-205-23).
10.
Install main navigation mast (TM 55-1925-205-23).
11.
Install SINCGARS antenna (TM 11-5820-890-10-8).
12.
Perform operational checks (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0090-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.