TM 55-2815-574-24
0142
INSTALLATION - Continued
Figure 2. Thermostat Housing.
5.
Remove LO/TO from A3 breaker switch. Refer to FM 4-01.502 for LO/TO procedure.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Service fresh water cooling system (TM 55-1925-205-10).
2.
Clean up spilled fluid with spill clean-up kit and dispose of spill clean-up kit waste in accordance with local
procedures.
END OF TASK
END OF WORK PACKAGE