TM 55-2815-574-24
FIELD MAINTENANCE
ENGINE
ELECTRICAL SYSTEM HOUR METER MOUNTING BRACKET REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
References
General mechanic's tool kit
TM 55-1925-205-10
Equipment Condition
Materials/Parts
Electrical system hour meter removed (WP 0161)
Personnel Required
Engineer 88L
REMOVAL
1.
Remove two pan head screws (Figure 1, Item 5) from hour meter mounting bracket (Figure 1, Item 4).
2.
Remove bracket (Figure 1, Item 4) from bracket (Figure 1, Item 6).
3.
Remove two capscrews (Figure 1, Item 3) and lockwashers (Figure 1, Item 2) from bracket
(Figure 1, Item 6).
4.
Remove bracket (Figure 1, Item 6) from flywheel housing (Figure 1, Item 1). Discard bracket.
Figure 1. Hour Meter Mounting Bracket.
END OF TASK