TM 55-2815-574-24
0112
INSTALLATION - Continued
Figure 2. Blower Drive.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
4.
5.
6.
7.
8.
Install crankcase breather limiter assembly (WP 0106).
9.
Install cylinder head poppet valve rocker arm covers (WP 0049).
10.
Install engine hatch (TM 55-1925-205-23).
11.
Install intake plenum or operator's cab (TM 55-1925-205-23).
12.
Install main navigation mast (TM 55-1925-205-23).
13.
Install SINCGARS antenna (TM 11-5820-890-10-8).
14.
Perform operational check of diesel engine (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE