TM 55-2815-574-24
0171
INSTALL HIGH WATER TEMPERATURE SWITCH - Continued
4.
Remove tags from wires.
5.
Remove LO/TO from A3 breaker switch. Refer to FM 4-01.502 for LO/TO procedure.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Service fresh water cooling system (TM 55-1925-205-23).
2.
Perform operational checks (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0171-3/blank