TM 55-2815-574-24
0155
FOLLOW-ON MAINTENANCE
1.
Start engine and verify there are no leaks (TM 55-1925-205-10).
2.
Start bilge pumps to remove raw water from bilge (TM 55-1925-205-10).
3.
Shut down engine (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0155-6