TM 55-2815-574-24
0151
INSTALLATION
1.
Wrap new zinc anode (Figure 3, Item 2) threads with antiseizing tape.
2.
Install zinc anode (Figure 3, Item 2) into fuel cooler (Figure 3, Item 1).
3.
Tighten zinc anode (Figure 3, Item 2).
Figure 3. Zinc Anode.
4.
Remove LO/TO from A3 breaker switch. Refer to FM 4-01.502 for LO/TO procedure.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Start engine (TM 55-1925-205-10).
2.
Start bilge pumps to remove raw water from bilge (TM 55-1925-205-10).
3.
Stop engine (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE