TM 55-2815-574-24
0109
INSTALLATION - Continued
5.
Install new gasket (Figure 2, Item 2) and cover (Figure 2, Item 3) onto flywheel housing (Figure 2, Item 1).
6.
Install six new lockwashers (Figure 2, Item 4), two nuts (Figure 2, Item 6), and four bolts (Figure 2, Item 5) to
secure blower driveshaft cover (Figure 2, Item 3) to flywheel housing (Figure 2, Item 1).
7.
Tighten nuts (Figure 2, Item 6) and bolts (Figure 2, Item 5).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
Install electronic governor rod assembly (WP 0097).
4.
Install engine tachometer signal generator (sending unit) (WP 0167).
5.
6.
7.
Install engine poppet valve rocker arm covers (WP 0049).
8.
9.
Install crankcase breather limiter assembly (WP 0110).
10.
Install engine fresh water cooling system bypass tube (WP 0143).
11.
12.
Install powered section engine hatch (TM 55-1925-205-23).
13.
Install operator's cab (TM 55-1925-205-10).
14.
Install intake plenum (TM 55-1925-205-10).
15.
Install main navigation mast (TM 55-1925-205-10).
16.
Install SINCGARS antenna (TM 11-5820-890-10-8).
17.
Perform operational checks (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0109-5/blank