Trailer Mounted Mobile Concrete Mixer Plant, U.S. Navy Service Manual,Zimmerman Industries, Ephrata, Pa., 1987.Chapter 8Bituminous Pavements, U.S. Army Subcourse EN5459, U.S. Army EngineerSchool, Fort Belvoir, Va.Engineering Aid 3 & 2, Volume 3, NAVEDTRA 10629-1, Naval Education andTraining Program Management Support Activity, Pensacola, Fla., 1984.Equipment Operator 1, NAVEDTRA 10641-H1, Naval Education and TrainingProgram Management Support Activity, Pensacola, Fla., 1986.Equipment Operator 1 & C, NAVEDTRA 10641-G1, Naval Education and TrainingProgram Management Support Activity, Pensacola, Fla., 1981.Equipment Operator 3 & 2, NAVEDTRA 10640-J1, Naval Education and TrainingProgram Management Support Activity, Pensacola, Fla., 1984.Pavement Maintenance Specialist, Volume 3, Flexible Pavements Course 55150,U.S. Air Force Air University, Gunter Air Force Base, Montgomery, Ala.Principles of Construction of Hot-Mix Asphalt Pavements, The Asphalt InstituteManual, Series No. 22, Asphalt Institute Building, College Park Md., 1983.Chapter 9Equipment Operator 1 & C, NAVEDTRA 10641-H, Naval Education TrainingProgram Management Support Activity, Pensacola, Fla., 1986.Geology, TM 5-545, Department of the Army, Washington, D.C., 1971.Integrated Logistic Support Plan for the Lightweight Well Drilling Rig System,NAVFAC ILSP 0311, Department of the Navy, Naval Facilities EngineeringCommand, Alexandria, Va., 1985.Self-Propelled Prototype Design Lightweight Easily Transported Well Drilling Rig,Ingersall-Rand Research, Inc., Princeton, N. J., 1985.Water Well Drilling (Failing Rig), SCBT 530.1, Naval Construction TrainingCenter, Gulfport, Miss., 1989.Well Drilling Operations, TM 5-297/AFM 85-23, Departments of the Army and theAir Force, Washington D.C., 1965.AIII-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business