INDEX
A
Alignments and adjustments, 3-4, 3-10, 3-18
clutch and brake assemblies, 3-10
CRP/CPP systems, 3-18
main reduction gear, 3-4
Allison 501-K17, 2-28
B
Bearings, 3-6 to 3-8, 3-10 to 3-11
line shaft, 3-10
main thrust, 3-6
stem tube, 3-11
strut, 3-11
Boilers, waste heat, 1-24
operating records, 1-25
treatment records, 1-25
Borescope, 2-1 to 2-26
general procedures, 2-2
geometric orientation, 2-3
indexing, 2-6
ports, 2-4
reporting results, 2-26
service limits, 2-9 to 2-26
C
Casualty control manuals, 1-11
feedback system, 1-16
verification checks, 1-15
Changeout, GTE, 2-28
Allison, 2-31
LM2500, 2-29
Clutch and brake assemblies, 3-8
alignments and adjustments, 3-10
maintenance, 3-9
Clutch and brake assembliesContinued
normal operation, 3-8
removal and replacement of components, 3-10
troubleshooting, 3-10
Corrosion, GTE, 2-33 to 2-39
causes, 2-34
characteristics, 2-36
prevention and control, 2-38
types, 2-36
CRP/CPP systems, 3-12
emergency operation, 3-16
inspections, 3-16
removal and replacement of components, 3-19
routine operation, 3-12
troubleshooting and maintenance, 3-16
D
Damage, object (GTE), 2-1
hazards, 2-1
prevention, 2-1
Diagrams, troubleshooting, 2-26
E
Economy trials, 1-19
ECSS troubleshooting, 2-27
Environmental pollution control program, 1-2 to 1-11
monitor operations, 1-3
prepare reports, 1-11
sample lesson plan, 1-3
training and drill evaluation, 1-3
F
Full power trial reports, 1-19
INDEX-1