INDEX
A
Air detachment, CESE and material preparation, 2-4,
2-6
Air detachment, CESE requirements, 2-3
Air detachment, crew assignments, 2-1
Air detachment equipment supervisor responsibilities,
2-1
collateral equipage, 2-14
crew assignments, 2-1
equipment platoon administration readiness, 2-1
to 2-2
equipment platoon operations, 2-15 to 2-16
operator assignments, 2-3 to 2-4
site arrival, 2-14 to 2-15
site selection, 2-14
Air detachment, mount-out/retrograde, 2-16 to 2-18
Air detachment, palletized cargo, 2-11 to 2-14
Air detachment, projects, 2-16
Air detachment, table of allowance, 2-2 to 2-3
Air detachment, vehicle shoring, 2-9 to 2-10
Air detachment, weighing and marking, 2-4 to 2-9
Apron feeder, 6-2
Asphalt batch plant, 8-12 to 8-15
asphalt introduction, 8-14
discharge gate, 8-15
plant automation, 8-15
pugmill mixing, 8-14
Asphalt, bituminous surfacing materials, 8-18
Asphalt, compacted weight and volume, 8-32
Asphalt, continuous-flow plant, 8-15 to 8-16
mixing time, 8-16
pugmill mixer, 8-15
Asphalt, drum-mix plant, 8-16 to 8-18
aggregate storage and feed, 8-16 to 8-17
asphalt metering, 8-17
burner operation, 8-18
drum-mix operation, 8-17 to 8-18
surge silo, 8-18
Asphalt, estimation of materials, 8-27
compute bituminous material, 8-31 to 8-33
estimates for asphalt plants, 8-33
prime coat, 8-27 to 8-28
surface treatment, 8-30 to 8-31
tack coat, 8-28 to 8-29
tons per hour, 8-33
Asphalt, field identification of bituminous materials,
8-23 to 8-24
field penetration test, 8-26
heat-odor test, 8-26
pour test, 8-25
smear test, 8-26
solubility test, 8-24
stone-coating test, 8-26 to 8-27
Asphalt plant operations, 8-2
aggregate cold-feed system, 8-2 to 8-5
asphalt heating and circulation, 8-10
dryer, 8-5 to 8-6
dust collector, 8-6 to 8-8
hot bin sampling, 8-9 to 8-10
hot bins, 8-9
hot screens, 8-8 to 8-9
mineral filler, 8-10 to 8-12
temperature of mixture, 8-10
Asphalt plant safety, 8-34
Asphalt plant supervisor responsibilities, 8-1 to 8-2
Asphalt temperature ranges, 8-11
INDEX-1