FILE #4 NETWORK FILE
LEFT
Computer Printouts
Level III
Level III Precedence Diagram
RIGHT Resource Leveled Plan for Manpower and Equipment
Equipment Requirement Summary
FILE #5 MATERIAL FILE
LEFT
List of Long Lead Items
45 Day Material List
Material Transfer Request
Add On/Reorder Justification Forms
Bill of Materials/Matetial Takeoff Comparison Work Sheets
Material Takeoff Work Sheets
RIGHT Bill of Materials (including all add-on/Reorder BMs)
FILE #6 QUALITY CONTROL FILE
LEFT
Various Quality Control Forms
Field Adjustment Request
RIGHT Daily Quality Control Inspection Reports
Quality Control Plan
FILE #7 SAFETY/ENVIRONMENT
LEFT
Required Safety Equipment
Stand-up Safety Lectures
Safety Reports
Accident Reports
RIGHT Safety Plan
Highlighted EM 385
Environmental Plan (if applicable)
FILE #8 PLANS FILE
LEFT
Site Layout
Shop Drawings
Detailed Slab Layout Drawings (if required)
Rebar Bending Schedule
Form Material Work Sheet
RIGHT Project Plans
FILE #9 SPECIFICATIONS FILE
LEFT
RIGHT
Technical Data
Highlighted Specifications
Figure 15-1.NCF project package outlineContinued.