2-47.
2-48.
2-49.
2-50.
2-51.
2-52.
2-53.
2-54.
Which of the following factors should be
included in the training of engineroom
personnel?
1.
2.
3.
4.
Consideration of the individual
difference in the learning rates of
personnel
Time to be spent on engine theory
prior to manual operation
Encouragement of personnel to notice
and discuss differences in the ways
that engines behave during operation
Each of the above
Question 2-48 is to be
False.
judged True or
An experienced Engineman reporting aboard
for duty from another type of ship will
require a certain amount of retraining to
qualify as a watchstander.
Which of the following factors should be
emphasized constantly throughout an
engineroom training program?
1.
Safety precautions
2.
Trial-and-error techniques
3.
Emergency repair procedures
4.
Machinery characteristics
Questions 2-50 through 2-53 are to be
judged True or False.
The PQS program is a method
ensure quality assurance.
designed to
Most PQS standards are divided into four
sections.
The watchstation section defines the
actual duties, assignments, and
responsibilities needed for
qualification.
As a work center supervisor, it is NOT
absolutely necessary for you to be PQS
qualified in all the equipment under your
control.
When personnel are assigned to repair V,
where should the emphasis be placed?
1.
PQS, qualification in damage control
2.
PQS, qualification in engineroom
takeover
3.
PQS, qualification in ship's 3-M
system
4.
PQS, qualification in first aid
2-55.
As a repair party leader, you are
responsible for which of the following
functions?
1.
Knowing how many personnel on the
ship are fully qualified in damage
control
2.
Training your repair party personnel
on the equipment they will be using
3.
Training your repair party personnel
in the function of a repair party
4.
Both 2 and 3 above
2-56.
What two Status Boards is Repair V
required to maintain?
1.
Stability and liquid load
2.
Auxiliary and main propulsion
machinery
3.
Air and surface contacts
4.
Personnel casualty and radiological
Learning Objective: Recognize the
purpose and the importance of the
Engineering Operational Sequencing
System (EOSS).
Question 2-57 is to be judged True or
False.
2-57.
The EOSS was developed to help combat the
problems created by rapid turnover of
personnel and the lack of needed
information.
2-58.
When the EOSS is used properly it
accomplishes which of the following
considerations?
1.
Reduces operational casualties
2.
Provides better plant control
3.
Extends the operational life of
machinery
4.
All of the above
2-59.
Under Stage I of the EOP, who has direct
control of an evolution involving the
starting and securing of a main engine?
1.
The engineering officer of the watch
2.
The engineroom top watch
3.
The main propulsion asistant
4.
The engineer officer
13