Figure 3. Dipstick.
LUBE OIL SYSTEM CRANKCASE PRESSURE TESTING

TECHNICAL MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR ENGINE 8V92TA
Page Navigation
  612    613    614    615    616  617  618    619    620    621    622  
img
TM 55-2815-574-24
0115
FILLING LUBE OIL SYSTEM CRANKCASE - Continued
19.
Replace dust cap (Figure 2, Item 1) on forward coupling half (Figure 2, Item 2).
20.
Remove LO/TO from A3 breaker switch. Refer to FM 4-01.502 for LO/TO procedure.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Disconnect pump electrical cord from 115 VAC shore outlet.
2.
Store pump electrical cord and pump suction and discharge hoses on FLOCS cart.
3.
Stow FLOCS cart in BII container (TM 55-1925-205-10).
4.
Clean up spilled fluid with a spill clean-up kit and dispose of spill clean-up kit waste in accordance with
local procedures.
5.
Install operator`s cab side access panel (TM 55-1925-205-10).
6.
Install intake plenum side access panel (TM 55-1925-205-10).
7.
Perform operational check of diesel engine (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0115-6