TM 55-2815-574-24
0157
INSTALLATION - Continued
5.
Install new gasket (Figure 2, Item 4) on exhaust manifold (Figure 2, Item 2).
6.
Install turbocharger flange adapter (Figure 2, Item 1) on manifold (Figure 2, Item 2).
7.
Install six nuts (Figure 2, Item 5) and new lockwashers (Figure 2, Item 6) on studs (Figure 2, Item 3).
8.
Wrap elbow (Figure 1, Item 2) threads with antiseizing tape.
9.
Install elbow (Figure 1, Item 2) on manifold (Figure 1, Item 3).
10.
Install coolant aspirator line (Figure 1, Item 1) on elbow (Figure 1, Item 2).
11.
Position new gasket (Figure 1, Item 8) on exhaust manifold (Figure 1, Item 3).
12.
Install cover plate (Figure 1, Item 7) on exhaust manifold (Figure 1, Item 3).
13.
Install six bolts (Figure 1, Item 5) and new lockwashers (Figure 1, Item 6) in cover (Figure 1, Item 7).
14.
Connect water inlet tube (Figure 1, Item 4) to exhaust manifold (Figure 1, Item 3).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
4.
5.
Install propulsion module engine hatch (TM 55-1925-205-23).
6.
Install operator's cab (TM 55-1925-205-10).
7.
Install intake plenum assembly (TM 55-1925-205-10).
8.
Install main navigation mast (TM 55-1925-205-10).
9.
Install SINCGARS antenna (TM 11-5820-890-10-8).
10.
Perform operational check of diesel engine (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0157-4