TM 55-2815-574-24
0100
INSTALLATION
1.
Install jam nut (Figure 2, Item 3) on new magnetic pick-up (Figure 2, Item 2).
2.
Install magnetic pick-up (Figure 2, Item 2) into flywheel housing (Figure 2, Item 4).
3.
Using feeler gauge (Figure 2, Item 1), verify magnetic pick-up (Figure 2, Item 2) is
0.015 0.0127 in. (0.0381 0.0127 cm) from flywheel ring gear (Figure 2, Item 5).
4.
Tighten jam nut (Figure 2, Item 3) on magnetic pick-up (Figure 2, Item 2).
5.
Verify gap between magnetic pick-up (Figure 2, Item 2) and ring gear (Figure 2, Item 5).
Figure 2. Flywheel.
6.
Connect electrical connector (Figure 3, Item 1) to magnetic pick-up (Figure 3, Item 2).
Figure 3. Electronic Governor.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install marine gear (TM 55-1925-319-23).
2.
Install marine gear oil pump (TM 55-1925-319-23).
3.
Install hydraulic pump (TM 55-1925-205-23).
4.
Service hydraulic system (TM 55-1925-205-23).