• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Verify butterfly valve on seachest is off.
HEAT EXCHANGER ZINC ANODE PLUG REPLACEMENT

TECHNICAL MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR ENGINE 8V92TA
Page Navigation
  770    771    772    773    774  775  776    777    778    779    780  
img
.
TM 55-2815-574-24
0152
INSTALLATION
1.
Wrap new zinc anode (Figure 3, Item 1) threads with antiseizing tape.
2.
Install zinc anode (Figure 3, Item 1) into marine gear cooler (Figure 3, Item 2).
3.
Tighten zinc anode (Figure 3, Item 1).
4.
Verify butterfly value (Figure 2, Item 1) on seachest is on.
Figure 3. Zinc Anode.
5.
Remove LO/TO from A3 breaker switch. Refer to FM 4-01.502 for LO/TO procedure.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Start engine (TM 55-1925-205-10).
2.
Start the bilge pumps to remove raw water from bilge (TM 55-1925-205-10).
3.
Stop the engine (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0152-3/blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.