TM 55-2815-574-24
SUSTAINMENT MAINTENANCE
ENGINE
FLYWHEEL HOUSING REPLACEMENT
INITIAL SETUP:
Materials/Parts (Continued)
Tools and Special Tools
Screw, Cap, Hexagon Head
General mechanic's tool kit
Screw, Cap, Hexagon Head
Chemical gloves
Screw, Cap, Hexagon Head
Flywheel housing alignment stud
Screw, Cap, Hexagon Head
Industrial goggles (WP 0179, Table 1, Item 54)
Lockwasher Qty: 6
Shackle, 1/2 in., 2 ton
Lockwasher Qty: 4
Sling, 5,300 lb 6 ft (green)
Sealing compound (pipe sealant)
Socket wrench set, 3/8 in. sqdr.
Sealing compound (ultra-blue)
Torque wrench, 150750 in-lb (1785 Nm)
Torque wrench, click, ratcheting, 1/2 in. drive,
0175 ft-lb (0237 Nm)
Personnel Required
Engineer 88L (2)
Equipment Condition
Materials/Parts
Air inlet collector assembly removed
Automotive and artillery grease
Engine lubricating oil, 10W
Blower drive shaft and spring removed
Flywheel housing (TM 55-1925-205-24P, 0201)
Marine gear oil cooler removed
(TM 55-2040-211-24)
Fuel system cooler removed
Screw, Cap, Hexagon Head
Screw, Cap, Hexagon Head
Starting motor removed
Screw, Cap, Hexagon Head
0072-1