TM 55-2815-574-24
0070
INSTALLATION - Continued
Figure 1. Flywheel Replacement.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install marine gear (TM 55-1925-319-23).
2.
Install marine gear oil pump (TM 55-1925-319-23).
3.
Install hydraulic pump (TM 55-1925-205-23).
4.
Install electronic control valve (TM 55-1925-319-23).
5.
Service marine gear (TM 55-1925-205-10).
6.
Install marine gear to transfer case drive shaft (TM 55-1925-205-23).
7.
Install marine gear to transfer case machinery guard (TM 55-1925-205-23).
8.
Install powered section engine hatch (TM 55-1925-205-23).
9.
Install operator`s cab or air intake plenum (TM 55-1925-205-23).
10.
Install navigation mast assembly (TM 55-1925-205-23).
11.
Install SINCGARS antenna (TM 11-5820-890-10-8).
12.
Perform operational checks (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE