• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Position drain pan under flanged oil tube
LUBE OIL SYSTEM HOSES REPLACEMENT

TECHNICAL MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR ENGINE 8V92TA
Page Navigation
  618    619    620    621    622  623  624    625    626    627    628  
img
.
TM 55-2815-574-24
0117
INSTALLATION
1.
Install new gasket (Figure 2, Item 2) on turbocharger (Figure 2, Item 1).
2.
Install new flanged oil tube (Figure 2, Item 3) on turbocharger (Figure 2, Item 1).
3.
Install two capscrews (Figure 2, Item 5) on flanged oil tube (Figure 2, Item 3).
4.
Tighten two capscrews (Figure 2, Item 5).
5.
Apply antiseize compound to threads of flanged oil tube (Figure 2, Item 3).
6.
Connect oil hose (Figure 2, Item 4) on flanged oil tube (Figure 2, Item 3).
7.
Tighten oil hose (Figure 2, Item 4).
Figure 2. Flanged Oil Tubes.
8.
Clean up spilled fluid with spill clean-up kit and dispose of spill clean-up kit waste in accordance with
local procedures.
9.
Remove LO/TO from A3 breaker switch. Refer to FM 4-01.502 for LO/TO procedure.
END OF TASK
FOLLOW-ON MAINTENANCE
Perform operational check of diesel engine (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0117-3/blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.