• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Using a wrench, hold the elbow or fitting
LUBE OIL PUMP REMOVAL AND INSTALLATION

TECHNICAL MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR ENGINE 8V92TA
Page Navigation
  621    622    623    624    625  626  627    628    629    630    631  
img
.
TM 55-2815-574-24
0118
INSTALLATION - Continued
Figure 1. Oil Hoses Replacement.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Clean up spilled fluid with spill clean-up kit and dispose of spill clean-up kit waste in accordance with local
procedure.
2.
Perform operational check of diesel engine (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0118-3/blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.