• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Perform operational checks (TM 55-1925-205-10).
Loosen clamp on inlet hose/tube assembly

TECHNICAL MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR ENGINE 8V92TA
Page Navigation
  695    696    697    698    699  700  701    702    703    704    705  
img
. . . . . . . . . . . . . . . .
TM 55-2815-574-24
0134
FIELD MAINTENANCE
ENGINE 
FRESH WATER COOLING SYSTEM HEAT EXCHANGER REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Materials/Parts (cont.)
General mechanic's tool kit
O-ring Qty: 4 (WP 0180, Table 1, Item 78)
(WP 0179, Table 1, Item 130)
(
Packing retainer Qty: 2
Air filtering respirator (WP 0179, Table 1, Item 109)
WP 0180, Table 1, Item 77)
Industrial goggles (WP 0179, Table 1, Item 54)
Chemical gloves (WP 0179, Table 1, Item 52)
Personnel Required
Utility apron (WP 0179, Table 1, Item 8)
Engineer 88L
Wire brush (WP 0179, Table 1, Item 21)
References
Materials/Parts
TM 55-1925-205-10
Cleaner (WP 0178, Table 1, Item 8)
WP 0023
Cleaning compound (WP 0178, Table 1, Item 9)
Gasket Qty: 3 (WP 0180, Table 1, Item 47)
Lockwasher Qty: 34 (WP 0180, Table 1, Item
Equipment Condition
106)
Engine cool to touch
Fresh water cooling system drained (WP 0133)
NOTE
This task is typical for both port and starboard heat exchangers.
REMOVAL
1.
Close butterfly seachest valve (Figure 1, Item 1).
Figure 1. Seachest Valve.
0134-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.