2-30.
What person should participate
in minor services and adjustments
performed on CESE unless
specifically directed otherwise?
1.
The operator
2.
The dispatcher
3.
The yard boss
4.
The technical librarian
2-31.
At what maintenance level is the
rebuild and overhaul of individual
assemblies accomplished?
1.
Organizational
2.
Preventive
3.
Intermediate
4.
Depot
2-32.
What level of maintenance requires
prior approval before extensive
repairs are performed or numerous
assemblies are rebuilt?
1.
Depot
2.
Intermediate
3.
Preventive
4.
Organizational
2-33.
Depot maintenance is performed by
which of the following departments?
1.
Civil Engineer Department (CED)
2.
CESE Equipo Department (CED)
3.
Construction Equipment
Department (CED)
4.
Contract Equipment Department
(CED)
2-34.
The standard time interval between
PM service inspections, for NCF
equipment, is what number of
working days?
1.
30
2.
40
3.
80
4.
90
2-35.
2-36.
2-37.
2-38.
2-39.
What supervisor is responsible for
determining when the PM interval
for a piece of CESE should be
reduced?
1.
The heavy shop supervisor
2.
The light shop supervisor
3.
The 5000 shop supervisor
4.
The maintenance supervisor
What type of PM inspection is
performed at intervals of 40
working days?
1.
Type A
2.
Type B
3. Type C
4.
Type D
What type of PM inspection is per-
formed when the mileage and hours
on a piece of CESE equal that
recommended by the manufacturer?
1.
Type A
2.
Type B
3. Type C
4.
Type D
What type of PM inspection is
directed by COMSECOND/COMTHIRDNCB
representatives?
1.
Type A
2.
Type B
3. Type C
4.
Type D
Learning Objective: Recognize
the repair parts program and
associated forms used in the
equipment maintenance program.
Where is the repair parts allowance
list for NCF organic and augment
CESE located?
1.
In the COSAL
2.
In the TOA
3.
In the SKO
4.
In the TAB A
12