4-73.
When computing the area of a cross
section, you perform what step
first?
1.
Compute the slope ratio
2.
Break the section down
into geometric figures
3.
Compute distance between
stations
4.
Compute elevation of the
final grade
4-74.
What NAVPAC publication contains
equipment production rates?
4-75.
In a project package, on what
document is the equipment
requirements to support each
construction activity documented?
1.
MAS sheet
2.
CAS sheet
3. MTO
4. BM
1.
NAVFAC P-404
2.
NAVFAC P-300
3.
NAVFAC P-306
4.
NAVFAC P-405