4-51.
4-52.
4-53.
4-54.
4-55.
4-56.
A sling should be maintained on the
crane at the end of each workday.
1.
True
2.
False
Which of the following number of
designators does NOT identify an
NCF TOA slings and rigging gear
kit?
1.
80104
2.
84003
3.
84004
4.
80056
To avoid confusion and doubt, you
may downgrade a sling to a lower
capacity.
1.
True
2.
False
What kit in the NCF TOA contains
the tools and equipment necessary
to fabricate 3/8-inch through
5/8-inch sizes of wire rope slings?
1.
80104
2.
80107
3.
80092
4.
84004
At what periodic intervals should
a visual inspection of all wire
rope slings and rigging gear be
performed?
1.
Every 30 days
2.
Every 60 days
3.
Every 75 days
4.
Every 90 days
The recommended COMSECOND/
COMTHIRDNCBINST wire rope lubricant
is composed of what mixture?
1.
70% diesel to 30% used oil
2.
70% diesel to 30% new oil
3.
70% new oil to 30% gas
4.
70% new oil to 30% diesel
4-57.
What action is required when
rigging gear becomes defective?
1.
Downgrade the capacity
2.
Survey it through supply
3.
Destroy it by cutting it up
4.
Store it in the rigging loft
Learning Objective: Recognize
the responsibilities of the pro-
ject supervisor and the concepts
of construction used in an NMCB.
4-58.
In an NMCB, what person has direct
responsibility for the successful
completion of all construction
projects?
1.
Commanding officer
2.
Operations officer
3.
Operations chief
4.
Project supervisor
4-59.
In an NMCB, what officer has the
direct supervisory authority over
the utilization of the battalions
construction resources?
1.
Executive officer
2.
Supply officer
3.
Embarkation officer
4.
Operations officer
4-60.
Within the Alfa company
organization, what person is
responsible to A-6 for all
prime and sub projects?
1. A-5
2. A-4
3. A-3
4.
A-32
4-61.
In an NMCB, what person appoints
project supervisors for assigned
construction projects?
1.
Company commander
2.
Operations officer
3.
Operations chief
4.
Projects chief
30