TM 55-2815-574-24
0141
INSTALLATION - Continued
Figure 1. Thermostat Housing.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install auto shutdown system high water temperature switch (WP 0171).
2.
Install fresh water cooling system thermostat (WP 0139).
3.
4.
5.
Install auto shutdown system fuel oil pressure switch (WP 0173).
6.
Install fresh water cooling system bypass tube (WP 0143).
7.
Service fresh water cooling system (TM 55-1925-205-10).
8.
Install engine deck hatch (TM 55-1925-205-23).
9.
Install powered section exhaust plenum (TM 55-1925-205-23).
10.
Install powered section intake plenum assembly (TM 55-1925-205-23).
11.
Install powered section operator's cab (TM 55-1925-205-23).
12.
Install main navigation mast (TM 55-1925-205-23).
13.
Install SINCGARS antenna (TM 11-5820-890-10-8).
14.
Start engine (TM 55-1925-205-10).
15.
Run engine for 5 minutes once operating temperature is reached.
16.
Verify that thermostat housing has no leaks.