• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Engine Alignment.
SUSTAINMENT MAINTENANCE ENGINE AIR BOX TESTING

TECHNICAL MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR ENGINE 8V92TA
Page Navigation
  136    137    138    139    140  141  142    143    144    145    146  
img
TM 55-2815-574-24
0034
FOLLOW-ON MAINTENANCE
1.
Install transfer case to pump-jet machinery guard (TM 55-1945-205-10).
2.
Install marine gear to transfer case machinery guard (TM 55-1945-205-10).
3.
Install engine hatch (TM 55-1945-205-23).
4.
Install thruster hatch (TM 55-1945-205-10).
5.
Install exhaust plenum (TM 55-1945-205-10).
6.
Install intake plenum (TM 55-1945-205-10).
7.
Install operator's cab (TM 55-1945-205-10).
8.
Install main navigation mast (TM 55-1945-205-10).
9.
Install SINCGARS antenna (TM 11-5820-890-10-8).
END OF TASK
END OF WORK PACKAGE
0034-3/blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.