• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Connect lifting slings and shackles to engine (Figure 1, Item 1).
SUSTAINMENT MAINTENANCE ENGINE ALIGNMENT

TECHNICAL MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR ENGINE 8V92TA
Page Navigation
  133    134    135    136    137  138  139    140    141    142    143  
img
. . . . . . . . . . .
TM 55-2815-574-24
0033
REMOVAL - Continued
Figure 1. Engine Stand.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install lube oil cooler (WP 0128).
2.
Install overspeed governor (WP 0169).
3.
Install lube oil dipstick tube assembly (WP 0130).
4.
Install starting motor (WP 0164).
5.
Install air box drains (TM 55-1925-205-10).
6.
Install air box covers (WP 0036).
7.
Install fuel system cooler (WP 0081).
8.
Install marine gear oil cooler mounting bracket (WP 0158).
9.
Install marine gear oil cooler (TM 55-2040-211-24).
10.
Install turbochargers (WP 0114).
11.
Install air inlet collector assembly (WP 0104).
12.
Install crankcase breather limiter assembly (WP 0106).
END OF TASK
END OF WORK PACKAGE
0033-3/blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.