• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Push Rod Adjustment.
CYLINDER HEAD REMOVAL AND INSTALLATION

TECHNICAL MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR ENGINE 8V92TA
Page Navigation
  216    217    218    219    220  221  222    223    224    225    226  
img
. . .
TM 55-2815-574-24
0046
FOLLOW-ON MAINTENANCE
1.
Install cylinder head poppet valve rocker arm covers (WP 0044).
2.
Install air inlet collector assembly (WP 0104).
3.
Install crankcase breather limiter assembly (WP 0106).
4.
Install engine hatch (TM 55-1925-205-23).
5.
Install operator's cab (TM 55-1925-205-10).
6.
Install intake plenum assembly (TM 55-1925-205-10).
7.
Install main navigation mast (TM 55-1925-205-10).
8.
Install SINCGARS antenna (TM 11-5820-890-10-8).
9.
Perform operational checks (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0046-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.