TM 55-2815-574-24
0092
ADJUSTMENT - Continued
Figure 3. Injector Adjustment.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install cylinder head poppet valve rocker arm cover (WP 0044).
2.
3.
Install crankcase breather limiter assembly (WP 0106).
4.
5.
Install powered section engine hatch (TM 55-1925-205-23).
6.
Install operator's cab (TM 55-1925-205-10).
7.
Install intake plenum assembly (TM 55-1925-205-10).
8.
Install main navigation mast (TM 55-1925-205-10).
9.
Install SINCGARS antenna (TM 11-5820-890-10-8).
10.
Perform operational checks (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE