• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
27. Position two retainers (3 and 7) on cam shaft gears (4 and 8).
50. Install cylinder head poppet valve rocker arms. (WP 0049)

TECHNICAL MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR ENGINE 8V92TA
Page Navigation
  318    319    320    321    322  323  324    325    326    327    328  
img
. . . . . . . . . . . . . . . . .
TM 55-2815-574-24
0063
INSTALL - Continued
NOTE
If measurement exceeds specified limits, the camshaft gears (4 and 8) must be
replaced as a pair.
32. Using a dial indicator, verify that the backlash between gears (4 and 8) is between 0.002 in. to 0.010 in.
4
8
33. Install fresh water cooling system pump drive gear. (WP 0148)
34. Install front balance weight cover. (WP 0077)
35. Install engine forward lifting bracket. (WP 0135)
36. Install camshaft accessory drive pulley. (WP 0067)
37. Install water pump. (WP 0147)
38. Install main fuel filter cartridge. (WP 0079)
39. Install heat exchanger. (WP 0134)
40. Service engine coolant. (WP 0133)
41. Install fresh water filter. (WP 0136)
42. Install flywheel housing. (WP 0072)
43. Install flywheel. (WP 0070)
44. Install lube oil pan. (WP 0127)
45. Install electronic governor magnetic pick-up. (WP 0100)
46. Install raw water pump. (WP 0155)
47. Install electrical system hour meter mounting bracket. (WP 0162)
48. Install electrical system hour meter. (WP 0161)
49. Install cylinder heads. (WP 0047)
0063-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.