TM 55-2815-574-24
0090
FOLLOW-ON MAINTENANCE
1.
Install cylinder head poppet valve rocker arm cover (WP 0044).
2.
3.
4.
5.
Install crankcase breather limiter assembly (WP 0106).
6.
7.
Install powered section engine hatch (TM 55-1925-205-23).
8.
Install operator's cab (TM 55-1925-205-23).
9.
Install intake plenum assembly (TM 55-1925-205-23).
10.
Install main navigation mast (TM 55-1925-205-23).
11.
Install SINCGARS antenna (TM 11-5820-890-10-8).
12.
Perform operational checks (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0090-4