TM 55-2815-574-24
0143
REMOVAL
1.
Loosen four hose clamps (Figure 1, Item 2).
2.
Remove four hose clamps (Figure 1, Item 2), two hoses (Figure 1, Item 3), and tube (Figure 1, Item 4) from
two thermostat housings (Figure 1, Item 1).
3.
Discard two hoses (Figure 1, Item 3).
END OF TASK
INSTALLATION
1.
Install four hose clamps (Figure 1, Item 2) on two hoses (Figure 1, Item 3).
2.
Assemble new hoses (Figure 1, Item 3) and tube (Figure 1, Item 4).
3.
Install hoses (Figure 1, Item 3) and tube (Figure 1, Item 4) on two thermostat housings (Figure 1, Item 1).
4.
Tighten four hose clamps (Figure 1, Item 2).
Figure 1. Cooling System Bypass Hoses.
END OF TASK