TM 55-2815-574-24
0170
INSTALLATION - Continued
Figure 8. Emergency Stop Solenoid Link.
10.
Install diodes (Figure 9, Item 2), electrical wiring harness (Figure 9, Item 4), and two hex nuts
(Figure 9, Item 3) on emergency stop solenoid (Figure 9, Item 1).
11.
Tighten hex nuts (Figure 9, Item 3).
12.
Remove marking tags from wiring.
13.
Remove LO/TO from A3 breaker switch. Refer to FM 4-01.502 for LO/TO procedure.
Figure 9. Emergency Stop Solenoid Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install operator's cab (TM 55-1925-205-23).
2.
Install intake plenum assembly (TM 55-1925-205-23).
3.
Install main navigation mast (TM 55-1925-205-23).