TM 55-2815-574-24
0067
INSTALLATION - Continued
Figure 1. Accessory Drive Pulley.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
Install fresh water cooling system heat exchanger (WP 0134).
3.
Service fresh water cooling system (TM 55-1925-205-10).
4.
Install powered section engine hatch (TM 55-1925-205-23).
5.
Install powered section intake plenum or operator's cab (TM 55-1925-205-10).
6.
Install SINCGARS antenna (TM 11-5820-890-10-8).
7.
Install main navigation mast (TM 55-1925-205-10).
8.
Perform operational checks (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE