TM 55-2815-574-24
0107
FOLLOW-ON MAINTENANCE
1.
2.
3.
Install electronic governor rod assembly (WP 0097).
4.
Install blower shaft and spring assembly (WP 0109).
5.
6.
7.
8.
Install cylinder head poppet valve rocker arm covers (WP 0049).
9.
10.
Install crankcase breather limiter assembly (WP 0106).
11.
Install fresh water cooling system bypass tube (WP 0143).
12.
13.
Install powered section engine hatch (TM 55-1925-205-23).
14.
Install operator's cab or intake plenum (TM 55-1925-205-10).
15.
Install main navigation mast (TM 55-1925-205-23).
16.
Install SINCGARS antenna (TM 11-5820-890-10-8).
17.
Perform operational check of diesel engine (TM 55-1925-205-10).
END OF TASK
END OF WORK PACKAGE
0107-4